Showing posts with label vest. Show all posts
Showing posts with label vest. Show all posts

Friday, October 14, 2011

Fridays are for finished things!


I have two finished projects this week: the Big Snowy Owl from the Purl Bee and the Schmidt vest I started about six weeks ago. The owl was probably about seven hours of actual knitting, although it took me a week to finish it, due to a variety of factors. The first was that I didn't have any polyfill to stuff it with, so I had to make a trip to the craft store for that. Then I didn't have any size 15 double pointed needles to do the eyes with, so I had to borrow some from a kind friend. After that, I had to wash the eyes because the grey yarn I used had so much spinning oil left in it that it smelled bad. Finally, when the eyes were dry, I was able to sew them on then knit the beak! I think I may make a few more of these owls, but I might just size them down and do them with worsted- or fingering-weight yarn. I think some tiny owls would be fun. They might even make nice Christmas ornaments. I'll have to let that idea marinate for a little while.


The Schmidt vest finished up much faster than I expected, but it probably helped that I was stuck in traffic for about an hour a few nights ago. You see, I thought it would be no big deal to go across the river to Indiana and back to buy some needles. It's only a mile across the bridge to Jeffersonville and the buses were running every half hour or so, so it couldn't be that bad, even with Shermageddon. Or so I thought. The flaw in my plan was that there was a Taylor Swift concert that night at the Yum! Center, which happens to be located right next to the bridge. So not only was there the usual rush hour traffic trying to leave downtown, there was additional traffic trying to get downtown for the show. It was gridlock. There were people (in heels! and sassy pants!) actually walking across the bridge faster than our bus could cross it. What should have taken an hour, at most, took two and a half. But that worked to my advantage, as I was able to knit the armhole and the collar while I was on the bus. I was even able to weave in all the ends. Once I finally got home, I gave it a good, long soak in some Eucalan and laid it out to dry. I think it looks pretty good with the Barbara Walker braided cable I used. I just hope it fits my brother in law. Keep your fingers crossed for me.


In WIPs news, I've begun knitting the little flowers for my Hydrangea bag. The pattern calls for plenty of them, but they knit up very quickly and it doesn't take much effort to weave in the ends. If I put in a little effort this weekend, there's a chance I could have the better part of them done by Tuesday. I may decide to to save that for my commute, though, as I'm feeling like I should do a little more on the striped intarsia socks that are taking me forever to finish. We'll see how that goes - I might also decide to cast on another baby project such as the super-secret one I have in mind for my friend Molly. It's going to be awesome! And I hope no one tells her what it is. It's a surprise for her baby shower. I sure hope I get an invitation.


Anyway, that's all I have for tonight. I hope you have a nice weekend, Friends!

Friday, October 7, 2011

It's Friday and I haven't really finished anything.

Unless you count the Kusha Kusha scarf that I got so sick of seeing unfinished that I knit another inch, then bound off. It's probably not quite long enough, but it'll just have to do. I expect that I'll felt it this weekend and decide after that what I'm going to do with it. I still have a whole cone of stainless steel yarn and about half the cone of merino left, so I might look around on the Rav to see if there's anything else to do with it. It might be a good, long while though.


In other news, the rest of the yarn for my Hydrangeas bag arrived this week. Three of the colors were exactly as called for in the pattern, and the fourth was a little darker. At first, I wasn't sure if it was going to work, but after seeing it in daylight this afternoon, I think it will be alright. I'll likely wind up the yarn so I can knit all the fidldy bits of flowers on my bus rides to and from work. I still have to get the bag handles and a zipper, but I have plenty of time for that.


As for the Snowy Owl, I've completed its ears and have closed the top. My friend, Mary, loaned me her size 15 double points, which made it easy to finish up. All I have left to do is knit the eyes and the beak and it will be ready to be loved by a special little kid. I think I have enough yarn left to make another one, so I might get to have one for myself!


I've also made a lot of progress on the Schmidt vest; the front shoulders are nearly done, which means I'll soon move on to the ribbing around the neck and the arm holes. The project continues to get admiring glances from folks on the bus, which is nice. I love that people show an interest in knitting as well as appreciation for hand knit goods. Most people mention that they had a grandmother or an aunt who knit and how they liked the stuff they made. Maybe they'll decide to pick up some needles themselves. It's possible.

Well, that's it for tonight. Until next time, friends.

Wednesday, September 28, 2011

Llamas on Broadway

I don't know what is going on with my brain, but I had the weirdest dream last night: I dreamt that my mother and I went to see a Broadway musical version of Romeo and Juliet, but that instead of having seats, we were bouncing around on trampolines poised over the backs of llamas which were in place of actual seats. Part of our job as audience members was that we had to bounce in time to the musical numbers, as well as do somersaults when the songs built to crescendo. In the dream I was actually pretty good at this, and it seemed that the trampolines were high enough over the backs of the llamas that we didn't injure them as we bounced, and also narrow enough that when the actors were speaking dialogue we could sit on the llamas' backs. The only bummer about this dream was that when it was time to go, one of my sandals slipped off my foot onto the floor, which was covered in llama pee and poo, and one of the handlers just handed it back to me like it wasn't covered in filth. I was about to give the handler a piece of my mind when the alarm clock went off. That handler was lucky I woke up!

Anyway, I don't know why I had that dream, although one of my friends did post a photo of a mama and baby alpaca on her blog the other day. That must have been it, though I have no idea when I last saw a trampoline. Weird.


In knitting news, I have been making more progress on the Schmidt Vest. I'm getting pretty close to the point where I can divide for the front and back, which makes me very happy. I definitely like how the cable up the front is coming out, and if you don't look too hard you won't see where I missed a crossing or two about 6 inches ago. The yarn is knitting up beautifully and it's still one of my cat's favorites; he took a nap on it the other day.

The cable needle seems not to bother him in the least.

I've also picked up the Knit All the Strings! socks and turned the heels on both. I did a nice, simple short-row heel and they're only a smidge too long, but I think that will be alright. I had to cut the yarn for 3 colors and rejoin after the heel, which isn't the worst thing ever, but I don't really care to weave in ends. I'm sure I'll feel better about it when both socks are done and I'm no longer wrestling with all those strands. And after I complete my exam this weekend.


Well, I guess that's it for tonight. I've got one more workday before I leave for Indianapolis to take this exam. I sure hope I can feel good about it when it's over. Until next time, Friends.

Monday, September 12, 2011

Sometimes, I finish things.

It seems that lately I've been casting on new projects left and right. I actually stopped myself from starting yet another new project because I have too many things on the needles. If I can finish the sparkly socks this week, then I think it will be alright to start a baby cardigan for the fifth person I've learned is expecting. This one's for a boy baby, so I'll have to find a pattern that's a little less precious than the stuff I tend to queue up on Ravelry.


Anyway, the finished stuff. I finally had my picture taken in my Peasy Cardigan, so you all can see it how it came out. I'm pretty pleased with it, especially the sleeve length. I tend to push up the sleeves on all my long-sleeved stuff, so doing these at three-quarters length will be fantastic.


I also finally photographed my Grun is die Hoffnung socks by Stephanie van der Linden. I kind of ad-libbed the cuff, with a picot edging that, sadly, did not make it into the photo. I'm not sure that I'm all that crazy about how it turned out, but I liked the construction of this sock and expect that I'll be playing around with it some more.


In WIPs news, progress continues apace with the Schmidt vest I'm making for my brother-in-law. I'm finding that the Barbara Walker cable I'm using is adding just the right amount of interest to keep me zipping through this stockinette vest.

Well, that looks like about all I've got for this update. Until next time, y'all!